CantiDeck

Vertical Materials and Equipment Logistics Solutions

 

The CantiDeck Story

We identified that there were common issues that project teams face on site around vertical logistics and goods movements. Their concerns included: safety of personnel while working at height, inefficient crane movements and costly temporary works and scaffolding systems.

Setting ourselves a challenge to overcome these issues we talked to our clients to identify how we could make vertical movements more efficient on site. We focussed on the moving of awkward or heavy loads of goods or equipment in and out of a building during the construction phase. Our design team proposed the concept of a temporary loading platform that could extend from a structure to allow materials and equipment to be loaded in and out of the building.


Solutions

Simplify and reduce on-site logistics

CantiDeck simplifies and reduces on-site logistics by increasing the efficiency of vertical movements of materials and equipment.

Reduce tower crane time

CantiDecks simplifies movements and allows large and bulky equipment and materials to be transported easily, which results in reduced crane usage and makes lifts easier to schedule.

Prevent project delays

By improving the effectiveness of tower cranes and reducing ‘down time’, projects can be completed quicker and the likelihood of the construction timings running over schedule is reduced.

How can we help you?

Benefits

  • Connector.

    Efficiency

    The fastest loading bay for relocation and installation. High Working Load Limit capacity to enable loading of a wide variety of materials, equipment and pre-fabricated sections.

  • Connector.

    Safety

    On-site training provided so that site operatives can relocate platforms safety, when required on site. A safer method of loading materials into a structure as it provides safe access.

  • Connector.

    Cost Saving

    Systems such as the CantiCrane can reduce overall project time. Less expensive than complex scaffolding systems and specifically engineered temporary loading platform. CantiDeck Hire can also be very cost-efficient.


Applications

Waste Management
Facade Installation
Materials Transportation
Pod Installation
Storage

Waste Management

Facade Installation

Materials Transportation

Pod Installation

Storage


Request a Brochure

Complete the details to receive your copy of our new CantiDeck brochure by post, or click ‘Download’ for a PDF version.

Download
  • This field is for validation purposes and should be left unchanged.

How we have helped others

A first for Guy’s and a first for Europe

The first Radiotherapy Treatment Centre in Europe to be located above basement level, the £160m Cancer Centre at Guy’s Hospital defines a revolution in the experience of cancer patients.

View Case Study

CantiDeck saves Principle Place project time and money

A large-scale, £350m office development construction in Shoreditch with an 11 storey steel frame structure, designed to form the new UK headquarters of online retailer Amazon.com.

View Case Study