Transpennine Route upgrade

TRU East Alliance (Network Rail, J. Murphy & Sons, VolkerRail, Siemens & Systra) with Ainscough Crane Hire

Transpennine Route upgrade

North England, UK

Fully-electric Smart-Release BulkX used on replacement railway bridge project in the UK

Persimmon Homes Development

CJL Construction Ltd for Persimmon Homes Severn Valley

Persimmon Homes Development

Somerset, UK

Temporary works design & shoring kit supply for housing development in Somerset

Elephant & Castle

Morrisroe and Multiplex

Elephant & Castle

London, UK

A landmark, complex construction and redevelopment masterplan that is a testament to collaborative engineering.

Hinkley Point C

BYLOR JV, a joint venture of Bouygues Travaux Publics and Laing O'Rourke

Hinkley Point C

Somerset, UK

An Energy Infrastructure Project Success Story

The Forum

Kier and Shore Group

The Forum

Gloucester, UK

Super Roller CantiDecks installed in a stacked configuration on multiple levels.

Harringtons Builders

Harringtons Builders plc

Harringtons Builders

London, UK

Harringtons Builders plc enhances fuel management and logistics with the Fuel Eco-Hub

Bridgebank

Bridgebank

Bridgebank

Nottingham, UK

Bridgebank has revolutionised its Fuel Management by integrating our Fuel Eco-Hub into Operations

HS2 Bespoke Working Platform

HS2

HS2 Bespoke Working Platform

UK

Redefining Shaft Access: Conquip's Lifting Innovation in HS2 Infrastructure Development

Northern Line Extension

FLO Joint Venture

Northern Line Extension

London, UK

Northern Line Extension: Advancing Safety in Shaft Loadout

Park Street

Gilbert Ash

Park Street

Cambridge, UK

End-to-end Temporary Works Scheme delivered directly for the Principal Contractor

Rozelle Interchange

CPB Contractors JV

Rozelle Interchange

Sydney, Australia

BulkX Streamlines Excavation at Australia’s Premier Road Infrastructure Project: WestConnex

Camden Goods Yard

AJ Morrisroe

Camden Goods Yard

Camden, NW1

Re-engineered Temporary Propping Scheme removes complexity and increases Project Efficiency

Thames Tideway

Tideway London - CVB JV

Thames Tideway

Greenwich Pumping Station, London

Mastering Complex Temporary Works Design for High Profile Infrastructure Project

2 Lucan Place

Deconstruct UK

2 Lucan Place

Kensington, London

Re-use. Re-use. Sustainability is practical with this modular temporary logistics deck

Admiral Park

Bellway Homes

Admiral Park

Surrey, UK

Dust suppression issue tackled head-on with simple, cost-effective solution.

St Pancras Campus

BAM Construction, John F Hunt

St Pancras Campus

Camden, London

Value engineered design reduces dig programme on sustainability-led development.

225 Marsh Wall

Modebest

225 Marsh Wall

Canary Wharf, London

The completed project will provide 332 new homes, restaurants, retail outlets and other non-residential institutions.

Marylebone Square

Morrisroe

Marylebone Square

Moxon Street, London

Value engineered temporary works design featuring bespoke tower crane grillages.

Cambridge House

Deconstruct UK

Cambridge House

Piccadilly, London

Delivering 4 levels of temporary propping and a bespoke Temporary Logistics Deck.

Stafford Gate

Alto Construct Ltd

Stafford Gate

Stafford

Improved access and minimum offload time increase operational efficiency at Stafford Gate.

Paddington Cube

Erith Group

Paddington Cube

Paddington Station, London

Our temporary modular propping system increased site access, reduced excavation time and improved safety.

Bow Street

Careys

Bow Street

Bow Street, London

BulkX ensures safe and efficient spoil removal from behind the façade of Grade II listed building.

Queensferry Crossing

Forth Crossing Bridge Constructors

Queensferry Crossing

Edinburgh and Fife, Scotland

Supplying high-quality products and innovative, bespoke solutions to Scotland's largest infrastructure project in a generation.

Crossrail

Dragados Sisk Joint Venture

Crossrail

Stepney Green, London

BulkX axes 12 weeks from dig program at Europe’s biggest construction project.

Royal Brompton Hospital

J P Dunn Construction

Royal Brompton Hospital

London SW3

Another cost-saving, efficient solution to a multi-storey excavation project

Metro Tunnel

CYP Design & Construction Joint Venture (CYP D&C) – Lendlease Engineering, John Holland, Bouygues Construction

Metro Tunnel

Federation Square, Flinders Street, Melbourne, VIC

Fast, effective spoil removal on the Melbourne Metro Tunnel Project.

UCLE Marshgate

Mace, Morrisroe

UCLE Marshgate

UCLE Marshgate at Queen Elizabeth Olympic Park

Close collaboration on temporary propping scheme with Morrisroe, allowed rapid delivery on Olympic Park project.

Parramatta Square

Mainland Civils

Parramatta Square

Parramatta Square, New South Wales

Cut excavation loadout time by 30% compared to conventional methods at Parramatta Square, NSW.

Tottenham Court Road

Bam Ferrovial Kier Joint Venture (Team BFK)

Tottenham Court Road

Tottenham Court Road Underground Station

Maximum safety, flexibility and traffic congestion reduction achieved within restricted site space.

Sydney Metro

John Holland CPB Ghella

Sydney Metro

Crows Nest Station, Sydney

Increasing efficiency of tunnelling muck away on Australia’s biggest public transport project.

Battersea Power Station

Vital Energi

Battersea Power Station

Battersea Power Station, London

Innovation Winner: Increasing safety while increasing speed, lifting awkward loads into a basement.

Mayfair

Careys Plc

Mayfair

Curzon Street, London

Efficient muck away solution for three storey basement excavation.

Regent House

Deconstruct UK

Regent House

London, UK

Value engineered temporary propping design and efficient spoil removal for a space confined basement construction.

New End

Leander, Blenheim House

New End

NW3, London

Manufacturing and project delivery in line with the design specification provided.

Heathrow Terminal 4

Toureen Group

Heathrow Terminal 4

Heathrow Terminal 4, London, UK

Close collaboration with the Toureen Group to develop a new Concrete Washout system to help manage and reuse concrete wastewater.

Commercial Road

Ardmore

Commercial Road

27 Commercial Road, London

Overcoming complex ground engineering with close collaboration and partnership

Ebury Square

Berkeley Group

Ebury Square

Ebury Square, Belgravia, London

Most expensive footprint construction site kept on schedule with CantiCrane.

Bloomberg

Sir Robert McAlpine, Josef Gartner GmbH

Bloomberg

London, UK

Multiple installation of CantiDeck solves challenges of personnel & equipment movement as well as material storage for a multi-building project.

Carey Street

Morrisroe

Carey Street

Carey Street, London

Safe, cost-effective and easy muck removal with system of two cycling BulkX skips

Cork Street

Kier, Deconstruct UK

Cork Street

Cork Street, London

Safe and efficient solution for rubble removal operating in tight residential street

Guy’s Hospital

Laing O’Rourke

Guy’s Hospital

London, UK

Fixed Flush CantiDeck allows for second storey installation of Radiotherapy equipment for Guy's Hospital.

Mersey Gateway

Merseylink JV

Mersey Gateway

nr Liverpool, UK

Efficient Excavation at one of the ‘Top 100 Global Infrastructure Projects’

Principal Place

Seele Gmbh, Michael J Lonsdale

Principal Place

London, UK

CantiDeck delivers simplified and fast loading of heavy and large materials despite space and access restrictions of central London location.