Case Studies

 

Boosting capacity on Sydney's road network, WestConnex, Rozelle Interchange

Rozelle Interchange View Case Study

BulkX Axes 12 Weeks From Stepney Green dig program

bulkx crossrail stepney greenView Case Study

BulkX stars in heritage listed building renovation project

bulkx sydneyView Case Study

Excavation Loadout Time Cut by 30% with Direct-to-Truck BulkX

View Case Study

Metro Tunnel Project
Town Hall Station

View Case Study

Increased Efficiency: Australia's Biggest Public Transport Project

bulkx sydney metroView Case Study

The Impossible Made Possible
in Mayfair

View Case Study

Efficient Excavation
at The Mersey Gateway

View Case Study

BulkX Makes Excavation Easy for Morrisroe at Carey Street

BulkX Carey StreetView Case Study

BulkX Pit Lane Gantry system solves logistical challenge at Bow Street

bulkx pit lane gantry system at Bow StreetView Case Study