Concrete Column Skip

A versatile, all-purpose skip for pouring concrete.

The Conquip Concrete Column Skip, sometimes known as a Tremie Skip, is a versatile, all-purpose skip for pouring concrete. We also offer a variation without a bale arm – click here to view.

The Concrete Column Skip can be used for more than just columns, it can be used for walls, narrow formwork and pipe laying work.

The bale arm version is available in a range of sizes from 500 litres to 2000 litres. A 3m discharge hose included.

Quantity

Details

  • Version without bale arm also available – click here to view
  • Provided with a 3 metre length of reinforced rubber discharge hose and pull rope for pouring concrete, at no extra cost.
  • Robust design to ensure durability on construction sites.
  • A strong spring retractor ensures automatic closing of the discharge gate when pouring is complete.
  • Designed to lay horizontally on the ground to assist filling from the concrete truck, when lifted the skip uses the bale arm to return to its vertical position.
  • Available in a range of sizes to ensure there is a solution for every project, regardless of the crane capacity or amount of concrete required.
  • Sometimes known as a tremie skip.

Specification

PRODUCT CODE HEIGHT HEIGHT WITH BALE WIDTH LENGTH LENGTH WITH BALE WLL* WEIGHT CAPACITY
CS210-00500 1200mm 1570mm 1370mm 1920mm 2480mm 1500kg 340kg 500 litres
CS210-00750 1340mm 1740mm 1520mm 2080mm 2670mm 2250kg 400kg 750 litres
CS210-01000 1350mm 1760mm 1520mm 2190mm 2760mm 3000kg 400kg 1000 litres
CS210-01500 1620mm 2110mm 1780mm 2440mm 3200mm 4500kg 660kg 1500 litres
CS210-02000 1670mm 2150mm 1780mm 2720mm 3500mm 6000kg 660kg 2000 litres

*Working Load Limit

User guide & technical docs