Concrete Column Skip Without Bale Arm
A versatile, all-purpose skip for pouring concrete.
The Conquip Concrete Column Skip, sometimes known as a Tremie Skip, is a versatile, all-purpose skip for pouring concrete.
The Column Skip can be used for more than just columns, it can be used for walls, narrow formwork and pipe laying work.
Details
- No bale arm design for additional safety.
- Provided with a 3-metre length of reinforced rubber discharge hose and pull rope for pouring concrete, at no extra cost.
- Robust design to withstand wear from use on construction sites.
- Strong spring retractor ensures discharge gate automatically closes when pouring is complete.
- Designed to lay horizontally on the ground to assist filling from the concrete truck.
- Available in capacities from 500 to 4000 litres, ensuring there is a solution for every project, regardless of the crane capacity or the amount of concrete required.
- Sometimes referred to on-site as a tremie skip.
Specification
| PRODUCT CODE | HEIGHT | WIDTH | LENGTH | WLL* | WEIGHT | CAPACITY |
| CS210AA-00500 | 1270mm | 1130mm | 1970mm | 1500kg | 360kg | 500 litres |
| CS210AA-01000 | 1465mm | 1385mm | 2350mm | 3000kg | 490kg | 1000 litres |
| CS210AA-01500 | 1660mm | 1590mm | 2450mm | 4500kg | 580kg | 1500 litres |
| CS210AA-02000 | 1670mm | 1590mm | 2730mm | 6000kg | 670kg | 2000 litres |
| CS210AA-03000 | 2130mm | 1980mm | 3500mm | 9000kg | 1000kg | 3000 litres |
| CS210AA-04000 | 2350mm | 2150mm | 3830mm | 12000kg | 1480kg | 4000 litres |
*Working Load Limit