Case StudiesDelivering innovative solutions to Piccadillydeep excavation projectView Case StudyA cost-saving, efficient solution to a multi-storey excavation project at Royal Brompton HospitalView Case StudyImproved access and minimum offload time increase operational efficiency at Stafford GateView Case StudyTemporary Outage Propping System improves Paddington Cube project efficiencyView Case StudyInnovative approach to spoil removal with Pit Lane Gantry BulkXView Case StudyLogistical challenges sesolved by diverse range of Lifting EquipmentView Case StudyBulkX axes 12 weeks fromStepney Green dig programView Case StudyMetro Tunnel project Town Hall StationView Case StudyClose collaboration onTemporary Propping SchemeView Case StudyCompact and flexible BulkX solutionfor restricted siteView Case StudyExcavation loadout time cut by 30%with Direct-to-Truck BulkXView Case StudyIncreased Efficiency:Australia's biggest public transport projectView Case StudyA custom lifting solution atBattersea Power StationView Case StudyTemporary Propping Design for Increased EfficiencyView Case StudyEfficient muck away for threestorey basement excavationView Case StudyQuality workmanship forGround Engineering fabricationView Case StudyOvercoming waste waterissues at HeathrowView Case StudyClose collaboration on complexGround EngineeringView Case StudyExpensive footprint site kepton schedule with CantiCraneView Case StudyThe impossible made possiblein MayfairView Case StudyEfficient excavationat The Mersey GatewayView Case StudyA first for Guy'sand a first for EuropeView Case StudyCantiDeck saves Principal Placeproject time & moneyView Case StudyBulkX makes excavation easyfor Morrisroe at Carey StreetView Case StudyLoading efficiency for award-winningBloomberg HQView Case Study