Great Ormond Street Hospital Children’s Cancer Centre: Case Study Transcript

Hi, I’m Jessica Drew. I’m Project Manager at CISP, and we’re here building Great Ormond Street Hospital Children’s Cancer Center.

The output of the job is to have a 10-story building, two stories below ground and eight stories above, with the top floor being a garden space with lots of play equipment. We’re going to have ward space, state-of-the-art theaters, and cytotoxic suites. Being able to bring in new technologies and new medicine straight to the patients is the real key end game of this job.

I’m Neil Young. I’m the Contracts Manager for Gethr.

Gethr’s package work on this building involved demolition of the previous building, the enabling works, piling, secant pile wall, basement vaulting, and RC frame.

Building in the heart of the city means space is very tight and logistics are very tough. Gethr have partnered with Conquip to design and supply the full basement propping solution. Conquip’s remit also extends to design, supply, and installation of two temporary logistics decks.

I’m Kevin Ryall. I’m the Senior Bid Manager at Conquip Engineering Group.

The two temporary logistics decks have increased the logistics footprint for the project, allowing excavators and cranes off public highway above the excavation, giving them additional access to the excavation and construction phases of the project. The first deck will primarily be used for a mobile crane, allowing craneage access to the basement. The second deck will start off being used for an excavator to provide excavation access.

It will later then be used for a mobile crane prior to the tower cranes for the project being erected.

On this project, we are surrounded by a fully live hospital with a pit lane to the south. Therefore, the installation of the temporary logistics decks was key. Being able to position plant and machinery on top of these decks to feed the basement has meant we can keep the pit lane open at all times, keeping the site flowing.

As part of this works package, we’ve designed the temporary propping for this project, which is a two-level basement.

That’s included design of the temporary corbels on the capping beam, and also temporary design check of the capping beam in the temporary condition.

Through the install of the props and through the design of the props and the gantries, we’ve had to do a lot of work between our design team, the local estates, to ensure that everyone understands why they’re needed.

Collaboration with Conquip early on has really assisted.

We’ve been able to plan for things a lot better, understand where our risks might be, where we may have program issues, and also where we can potentially gain time.

Having that early engagement, making sure everyone was on board and was really helpful.

Conquip’s temporary works team have been first class and a pleasure to work with throughout the whole project.