What is a Temporary Logistics Deck? A Guide to Creating Extra Space on Constrained Sites

2nd, November 2026

Working space is often the most significant logistical challenge on a major ground engineering project in a city environment.

As excavation gets underway, the available site footprint and access locations become increasingly constrained. These restrictions become more apparent as different work activities develop and compete for the available space, more plant starts to operate, an increase in the number of vehicles unloading and loading, and a growing requirement for equipment and associated facilities such as concrete pouring and washout, dust suppression and workforce stations.

Conquip’s modular, proprietary Temporary Logistics Deck can be incorporated into the temporary works phase of a project to create opportunities for additional working space and improved access.

The Temporary Logistics Deck can be deployed to provide a dedicated logistical platform that can span over, around or into an excavation as a standalone space-creator and can be integrated with other elements of the temporary works phase such as the temporary propping.

Depending on the project, one or more decks can provide access and a working platform for heavy plant such as cranes, excavators, soil and concrete wagons. Create additional storage space, form a temporary bridge or even provide a vehicle route into an excavation.

Meet the Expert on the Temporary Logistics Deck

In our latest ‘Meet the Expert’ video, Kevin Ryall explains more about the Temporary Logistics Deck, the different ways it can be configured and how it can help solve complex site logistics and space challenges.

Let’s dive into the details….

What is a Temporary Logistics Deck?

A Temporary Logistics Deck is a modular, engineered platform designed to create usable working or access space where the permanent site layout does not provide enough room.

This can be particularly valuable on constrained projects where excavations, basements or other working areas take up a large section of what was the original available site footprint.

A temporary Logistics Deck can be used to maintain access and usable working space above or around these areas, allowing essential construction activities to continue without being compromised by the reduced ground-level footprint. The deck, the type of supporting subframe and the loads applied to it all need to be precisely engineered as part of the temporary works design.

How can a Temporary Logistics Deck be configured?

One of the main advantages of the modular Temporary Logistics Deck is that it can be configured around the project requirements and construction methodology, avoiding the need to adapt the project to a standard platform or invest in a fully bespoke solution.

A range of configurations can be considered to improve the use of available space and access across the site:

Single span deck

A single-span deck spans between two areas of permanent works, creating temporary working space above an excavation.

This can help maintain access or create additional operational space while work continues underneath.

Corner supported deck

A corner-supported deck works in a similar way but is configured to span across the corner of an excavation.

It can be useful where the geometry of the excavation or surrounding permanent works makes a
conventional straight span impractical.

Pile supported deck

Where suitable permanent works are not available to support the deck, a pile-supported configuration can be used.

The supporting subframe is installed onto plunge columns founded into concrete piles, providing the structure required for the deck above.

 

Bridging deck

The modular decking system can be configured to create a temporary bridge over  excavations, openings, voids or other areas requiring clear-span access.

This can help maintain plant, vehicle or site access between areas that would otherwise become separated as excavation progresses.

Gantry deck

A gantry configuration creates an elevated platform
that can provide additional working or storage space.

On particularly constrained sites, making better use of vertical space can help reduce pressure on the limited ground-level footprint.

Vehicle ramp

A Temporary Logistics Deck can also be designed as a temporary vehicle ramp, allowing suitable plant and construction vehicles to access an excavation or traverse between differing levels.

The required geometry and loading would be considered during the engineering and temporary works design process.

How is a Temporary Logistics Deck installed?

Installation starts with the supporting structure.

The subframe is installed first, creating the support for the deck modules above. The modular deck sections are then installed onto the subframe. Edge protection should be pre-installed to provide safe leading edges for Work At Height activities.

Because the system is modular, installation can typically be completed quickly, especially when compared to more traditional site-built solutions.

There is not one standard installation time for every deck. The programme will depend on factors including:

  • The size and configuration of the deck
  • The supporting structure
  • Site access and craneage
  • The excavation or permanent works geometry
  • The number of deck modules
  • The required sequencing with other construction activities.

Planning the engineering of and around the deck early helps to make sure installation is incorporated into the wider construction sequence rather than becoming another logistical consideration later in the programme.

What support does Conquip provide during installation?

A Temporary Logistics Deck is more than the deck modules themselves.

Conquip can support contractors from the early planning stage through to installation on site, including interfaces with other temporary and permanent works.

Our in-house engineering team can develop the deck and subframe arrangement taking into consideration all other project requirements, such as geometry, access, working load limit requirements, and the wider construction methodology.

Once the deck modules and ancillaries arrive site, our specialist on-site engineers can also provide support ranging from supervision and guidance for the site team through to full installation.

What is the maximum load for a Temporary Logistics Deck?

The Temporary Logistics Deck can accommodate significant loads, with the overall capacity determined by the supporting subframe, which is engineered to meet the project requirements while balancing structural performance, cost and environmental efficiency. Depending on the scheme, this could include loads associated with:

  • Long-reach excavators
  • Concrete pumps
  • Mobile cranes
  • Delivery HGVS
  • Dumpers and other site vehicles
  • Construction materials and storage
  • Other project-specific plant or equipment, including concrete washout.

When should a Temporary Logistics Deck be considered?

A Temporary Logistics Deck should be considered whenever a project needs a temporary platform to provide access or storage over, around or into an excavation or site works.

With our in-house engineering teams, customers benefit from having personalised support for exactly what is needed for their site and pack or works. The Temporary Logistics Deck can also be changed throughout the project (subject engineered design approval), plus, multiple decks can be installed and used when required.

Here are the main examples:

  • Restricted site footprint: Creates additional space for plant, storage and vehicle movements on constrained sites.
  • Disrupted access routes: Maintains access across excavations while work continues below.
  • Heavy plant operations: Provides an engineered platform to support excavators, cranes, concrete pumps and other plant.
  • Access into excavations: Can be configured as a vehicle ramp for plant and equipment.
  • Additional storage or working space: Creates elevated space without increasing the site footprint.

Early planning matters

The greatest benefit often comes from discussing the logistics and space challenges at an early stage before the temporary works strategy is developed and programme and other surrounding works are fixed.

Understanding what needs to travel across or operate on it and when it will be required, gives the engineering team more opportunity to develop the right configuration around the project.

Learn more about our Temporary Logistics Deck here.

Explore our Temporary Logistics Deck in action, view our case studies…

Temporary Logistics Deck FAQs

Ask below the questions that our engineering teams frequently get asked…

How early should we involve Conquip when considering a Temporary Logistics Deck I our temporary works scheme?

Ideally, Conquip should be involved as early as possible during the planning and design stages, particularly where site space, access or construction logistics are likely to be constrained. Early engagement allows the Temporary Logistics Deck to be considered alongside and as part of the overall temporary works strategy and construction methodology, helping to identify opportunities to improve site utilisation, coordinate interfaces and avoid costly changes later in the project.

What information do you need from the contractor before starting the Temporary Logistics Deck design?

To develop an effective solution, we would typically require the site layout and relevant drawings, details of the excavation or structure, proposed plant and vehicle types, loading requirements, access arrangements and intended construction methodology. Information on the programme, installation constraints and any restrictions imposed by the permanent works is also valuable. We understand, particularly during the early stages of a project, not all information may be available, so we work with the information provided, agree appropriate design assumptions with the contractor and develop the proposal as further details become available.

How long does a typical Temporary Logistics Deck take to install?

One of the key advantages of the Temporary Logistics Deck is the speed with which it can be installed and removed, helping to minimise disruption to the construction programme. We have installed decks in as little as 2–3 days, although larger or more complex configurations will take longer, depending on the size of the deck, supporting arrangement, site access and installation requirements. Conquip can advise on anticipated installation and removal durations once the proposed arrangement and site conditions are understood.

Can the Temporary Logistics Deck design change if the plant or loading requirements change during the project?

Yes. The Temporary Logistics Deck can be designed to accommodate changes in construction sequencing and methodology throughout the project. This can include phased installation or removal, or changes to the deck configuration to suit evolving site requirements, subject to engineering approval. It’s important that any anticipated changes are identified as early as possible during the design stage. This allows them to be incorporated into the initial design wherever practicable, helping to minimise the need for design revisions and avoid unnecessary cost or disruption to the programme.

What is the heaviest piece of plant you have designed a Temporary Logistics Deck to support?

Temporary Logistics Decks are designed around the specific requirements of each project, rather than being limited to a single standard plant weight or load capacity. Previous projects have included Temporary Logistics Deck designed to accommodate 35-tonne clamshell excavators, 90-tonne mobile cranes and 32-tonne tipper wagons, as well as concrete wagons and pumps. Designs have also incorporated material storage loads of up to 20 kPa uniformly distributed load (UDL). Plant and equipment have been assessed both individually and in combination, ensuring that the deck and supporting subframe are engineered to accommodate the required loading arrangements for each project.

Can a Temporary Logistics Deck be supported from the permanent works?

Yes. The permanent works are commonly used to support all or part of a Temporary Logistics Deck and are generally the preferred option, where feasible, to minimise the amount of additional temporary structure required. The permanent structure is assessed to ensure that any loads imposed by the deck remain within its allowable capacity. These loads and the proposed support arrangements are then coordinated with the permanent works designer for review and approval as part of the design process.

When would you use a pile-supported Temporary Logistics Deck rather than supporting it from the permanent structure?

A pile-supported arrangement would only generally be considered where the permanent works cannot accommodate the required loads, where the size or geometry of the deck or permanent structure is such that additional support points are required within the excavation, or where the construction sequence means the permanent works cannot be used to support the platform for the full duration required. Where feasible, supporting the deck from the permanent works remains the preferred option to minimise the amount of additional temporary structure required. However, a pile-supported solution can provide the necessary flexibility to accommodate the project’s structural, geometric and sequencing requirements.

What size can a Temporary Logistics Deck be designed to?

The Temporary Logistics Deck can be configured to suit a wide range of project requirements, with the modular system allowing layouts to be developed in multiples of the standard 5.0 m × 2.5 m deck module. Typical deck lengths include 5.0 m, 7.5 m and 10.0 m, with widths spanning 15 m, 20 m, 30 m or more, depending on the project requirements. The overall size and configuration will be determined by the project requirements, taking into account the supporting subframe design, site constraints and any other factors that may influence the arrangement.

Can a Temporary Logistics Deck be designed to accommodate irregular or non-standard site layouts?

Yes. The Temporary Logistics Deck can be configured to accommodate a variety of site layouts and geometric constraints. The standard modules are rectangular, making square and rectangular configurations the most straightforward and efficient to achieve. Where the layout requires a different shape, 45° triangular arrangements can be achieved using triangular infill units. For more irregular geometries, bespoke units or reinforced concrete (RC) infills can be incorporated to suit the specific site layout and project requirements.

Speak to our Temporary Works team about your site logistics requirements.